Riihimäen Swimming Pool

The Riihimäki Swimming Hall underwent a renovation during 2023-2025. Our company supplied the glass for this project in cooperation with Consti Korjausrakentaminen Oy and Oy Steelpro Ltd. Railing glass laminated with EVA film was installed for indoor and outdoor use. The EVA membrane is perfect for damp areas, due to its excellent adhesion.

The following glass structures were delivered to the site:

  • 5+5 0,76 EVA tempered laminated KRH sanded
  • 10+10 0,76 EVA tempered laminated KRH sanded
  • 12+12 0,76 EVA tempered laminated KRH sanded